Statistics of all solutions for janos-us--D-D-S-N-C-A-N-N



General statistics:

sol2--janos-us--D-D-S-N-C-A-N-N sol1--janos-us--D-D-S-N-C-A-N-N
Total cost 1492723.00 1493432.00
  Total link capacity cost 1492723.00 1493432.00
    Preinstalled capacity cost 0.00 0.00
    Additional module capacity cost 1492723.00 1493432.00
  Routing cost 0.00 0.00
Min node degree 4 4
Max node degree 10 10
Average node degree 6.46 6.46
Min node in-degree 2 2
Max node in-degree 5 5
Average node in-degree 3.23 3.23
Min node out-degree 2 2
Max node out-degree 5 5
Average node out-degree 3.23 3.23
84 84
218240.00 218176.00
98.61% 97.57%
100.00% 100.00%
99.91% 99.82%


Routing statistics:

sol2--janos-us--D-D-S-N-C-A-N-N sol1--janos-us--D-D-S-N-C-A-N-N
Total working flow 218076.00 217836.00
Min NOS path length 1 1
Max NOS path length 9 9
Average NOS path length 3.56 3.58
Total number of NOS paths 693 688
Min number of NOS paths per demand 1 1
Max number of NOS paths per demand 3 4
Average number of NOS paths per demand 1.07 1.06



© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de