Statistics of all solutions for germany50--U-U-M-N-C-A-N-N



General statistics:

sol1--germany50--U-U-M-N-C-A-N-N sol2--germany50--U-U-M-N-C-A-N-N
Total cost 649670.00 645520.00
  Total link capacity cost 649670.00 645520.00
    Preinstalled capacity cost 0.00 0.00
    Additional module capacity cost 649670.00 645520.00
  Routing cost 0.00 0.00
Min node degree 1 1
Max node degree 5 5
Average node degree 3.36 3.36
84 84
7240.00 7200.00
37.50% 52.50%
100.00% 100.00%
94.98% 98.51%


Routing statistics:

sol1--germany50--U-U-M-N-C-A-N-N sol2--germany50--U-U-M-N-C-A-N-N
Total working flow 7002.00 7140.00
Min NOS path length 1 1
Max NOS path length 13 10
Average NOS path length 3.62 3.78
Total number of NOS paths 693 724
Min number of NOS paths per demand 1 1
Max number of NOS paths per demand 4 3
Average number of NOS paths per demand 1.05 1.09



© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de