Statistics of all solutions for norway--U-U-E-N-C-A-N-N



General statistics:

sol1--norway--U-U-E-N-C-A-N-N sol2--norway--U-U-E-N-C-A-N-N sol3--norway--U-U-E-N-C-A-N-N
Total cost 465440.00 461380.00 476100.00
  Total link capacity cost 465440.00 461380.00 476100.00
    Preinstalled capacity cost 0.00 0.00 0.00
    Additional module capacity cost 465440.00 461380.00 476100.00
  Routing cost 0.00 0.00 0.00
Min node degree 1 1 1
Max node degree 3 3 4
Average node degree 2.22 2.15 2.22
30 29 30
30000.00 29000.00 36000.00
36.50% 36.50% 22.85%
100.00% 100.00% 100.00%
85.42% 86.50% 78.53%


Routing statistics:

sol1--norway--U-U-E-N-C-A-N-N sol2--norway--U-U-E-N-C-A-N-N sol3--norway--U-U-E-N-C-A-N-N
Total working flow 25625.00 25085.00 25161.00
Min NOS path length 1 1 1
Max NOS path length 11 14 13
Average NOS path length 4.87 4.74 4.76
Total number of NOS paths 708 706 705
Min number of NOS paths per demand 1 1 1
Max number of NOS paths per demand 2 2 2
Average number of NOS paths per demand 1.01 1.01 1.00



© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de