Statistics of all solutions for france--D-B-S-N-C-A-N-N



General statistics:

sol1--france--D-B-S-N-C-A-N-N sol2--france--D-B-S-N-C-A-N-N
Total cost 12400.00 12400.00
  Total link capacity cost 12400.00 12400.00
    Preinstalled capacity cost 0.00 0.00
    Additional module capacity cost 12400.00 12400.00
  Routing cost 0.00 0.00
Min node degree 1 1
Max node degree 10 10
Average node degree 2.96 2.88
Min node in-degree 1 1
Max node in-degree 10 10
Average node in-degree 2.96 2.88
Min node out-degree 1 1
Max node out-degree 10 10
Average node out-degree 2.96 2.88
37 36
155000.00 155000.00
49.00% 54.04%
100.00% 100.00%
93.03% 92.28%


Routing statistics:

sol1--france--D-B-S-N-C-A-N-N sol2--france--D-B-S-N-C-A-N-N
Total working flow 146333.00 145741.00
Min NOS path length 1 1
Max NOS path length 7 6
Average NOS path length 2.93 2.89
Total number of NOS paths 320 321
Min number of NOS paths per demand 1 1
Max number of NOS paths per demand 2 3
Average number of NOS paths per demand 1.07 1.07



© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de