Statistics of all solutions for norway--D-B-E-N-C-A-N-N



General statistics:

sol2--norway--D-B-E-N-C-A-N-N sol1--norway--D-B-E-N-C-A-N-N
Total cost 384030.00 407070.00
  Total link capacity cost 384030.00 407070.00
    Preinstalled capacity cost 0.00 0.00
    Additional module capacity cost 384030.00 407070.00
  Routing cost 0.00 0.00
Min node degree 1 1
Max node degree 3 3
Average node degree 2.00 2.00
Min node in-degree 1 1
Max node in-degree 3 3
Average node in-degree 2.00 2.00
Min node out-degree 1 1
Max node out-degree 3 3
Average node out-degree 2.00 2.00
27 27
27000.00 30000.00
17.10% 17.10%
100.00% 99.00%
59.89% 59.66%


Routing statistics:

sol2--norway--D-B-E-N-C-A-N-N sol1--norway--D-B-E-N-C-A-N-N
Total working flow 16171.00 16657.00
Min NOS path length 1 1
Max NOS path length 15 17
Average NOS path length 5.79 5.97
Total number of NOS paths 704 702
Min number of NOS paths per demand 1 1
Max number of NOS paths per demand 2 1
Average number of NOS paths per demand 1.00 1.00



© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de