Total cost | 879520.00 |
Total link capacity cost | 879520.00 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 879520.00 |
Routing cost | 0.00 |
Min node degree | 2 |
Max node degree | 5 |
Average node degree | 2.86 |
Total number of installed links | 40 |
Total installed link capacities | 5980.00 |
Min link capacity usage in NOS | 72.38% |
Max link capacity usage in NOS | 100.00% |
Avg link capacity usage in NOS | 97.25% |
Total working flow | 5794.00 |
Min NOS path length | 1 |
Max NOS path length | 9 |
Average NOS path length | 3.77 |
Total number of NOS paths | 396 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 2 |
Average number of NOS paths per demand | 1.05 |