Total cost | 128047.21 |
Total link capacity cost | 128047.21 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 128047.21 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 6 |
Average node degree | 2.40 |
Total number of installed links | 12 |
Total installed link capacities | 1565000.00 |
Min link capacity usage in NOS | 23.99% |
Max link capacity usage in NOS | 99.14% |
Avg link capacity usage in NOS | 71.69% |
Total working flow | 929467.00 |
Min NOS path length | 1 |
Max NOS path length | 6 |
Average NOS path length | 2.56 |
Total number of NOS paths | 90 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 1 |
Average number of NOS paths per demand | 1.00 |