Total cost | 649670.00 |
Total link capacity cost | 649670.00 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 649670.00 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 5 |
Average node degree | 3.36 |
Total number of installed links | 84 |
Total installed link capacities | 7240.00 |
Min link capacity usage in NOS | 37.50% |
Max link capacity usage in NOS | 100.00% |
Avg link capacity usage in NOS | 94.98% |
Total working flow | 7002.00 |
Min NOS path length | 1 |
Max NOS path length | 13 |
Average NOS path length | 3.62 |
Total number of NOS paths | 693 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 4 |
Average number of NOS paths per demand | 1.05 |