Total cost | 729100.00 |
Total link capacity cost | 729100.00 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 729100.00 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 5 |
Average node degree | 2.55 |
Total number of installed links | 14 |
Total installed link capacities | 135.00 |
Min link capacity usage in NOS | 62.50% |
Max link capacity usage in NOS | 100.00% |
Avg link capacity usage in NOS | 87.95% |
Total working flow | 115.00 |
Min NOS path length | 1 |
Max NOS path length | 4 |
Average NOS path length | 2.14 |
Total number of NOS paths | 22 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 1 |
Average number of NOS paths per demand | 1.00 |