Total cost | 164570.00 |
Total link capacity cost | 164570.00 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 164570.00 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 6 |
Average node degree | 2.94 |
Total number of installed links | 25 |
Total installed link capacities | 1580.00 |
Min link capacity usage in NOS | 70.00% |
Max link capacity usage in NOS | 100.00% |
Avg link capacity usage in NOS | 95.17% |
Total working flow | 1516.00 |
Min NOS path length | 1 |
Max NOS path length | 7 |
Average NOS path length | 2.76 |
Total number of NOS paths | 121 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 1 |
Average number of NOS paths per demand | 1.00 |