Total cost | 106779.40 |
Total link capacity cost | 106779.40 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 106779.40 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 8 |
Average node degree | 2.20 |
Total number of installed links | 11 |
Total installed link capacities | 1245000.00 |
Min link capacity usage in NOS | 16.11% |
Max link capacity usage in NOS | 100.00% |
Avg link capacity usage in NOS | 74.54% |
Total working flow | 793281.00 |
Min NOS path length | 1 |
Max NOS path length | 5 |
Average NOS path length | 2.20 |
Total number of NOS paths | 92 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 2 |
Average number of NOS paths per demand | 1.02 |