Total cost | 14883708.00 |
Total link capacity cost | 14883708.00 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 14883708.00 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 4 |
Average node degree | 2.36 |
Total number of installed links | 13 |
Total installed link capacities | 13440.00 |
Min link capacity usage in NOS | 28.75% |
Max link capacity usage in NOS | 95.21% |
Avg link capacity usage in NOS | 65.08% |
Total working flow | 8487.00 |
Min NOS path length | 1 |
Max NOS path length | 6 |
Average NOS path length | 2.00 |
Total number of NOS paths | 24 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 1 |
Average number of NOS paths per demand | 1.00 |