Total cost | 1077138.00 |
Total link capacity cost | 1061200.00 |
Preinstalled capacity cost | 0.00 |
Additional module capacity cost | 1061200.00 |
Routing cost | 15938.00 |
Min node degree | 1 |
Max node degree | 3 |
Average node degree | 1.88 |
Total number of installed links | 15 |
Total installed link capacities | 15000.00 |
Min link capacity usage in NOS | 11.20% |
Max link capacity usage in NOS | 93.60% |
Avg link capacity usage in NOS | 53.13% |
Total working flow | 7969.00 |
Min NOS path length | 1 |
Max NOS path length | 12 |
Average NOS path length | 4.86 |
Total number of NOS paths | 240 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 1 |
Average number of NOS paths per demand | 1.00 |