Total cost | 38752.00 |
Total link capacity cost | 38752.00 |
Preinstalled capacity cost | 2400.00 |
Additional module capacity cost | 36352.00 |
Routing cost | 0.00 |
Min node degree | 1 |
Max node degree | 7 |
Average node degree | 2.91 |
Total number of installed links | 16 |
Total installed link capacities | 7460.00 |
Min link capacity usage in NOS | 68.39% |
Max link capacity usage in NOS | 100.00% |
Avg link capacity usage in NOS | 92.10% |
Total working flow | 6873.00 |
Min NOS path length | 1 |
Max NOS path length | 5 |
Average NOS path length | 2.12 |
Total number of NOS paths | 114 |
Min number of NOS paths per demand | 1 |
Max number of NOS paths per demand | 2 |
Average number of NOS paths per demand | 1.04 |