Solution sol3--pdh--U-U-E-N-C-A-N-N



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 11114202.00
16
Total installed link capacities 6780.00
Average link capacity usage 89.97%
Average path length 1.59
Total number of paths 29
Average number of paths per demand 1.21
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Christian Raack, Zuse-Institute Berlin
Submission Date 06.11.2006
Additional information edge-flow formulation, CPLEX 10.0 plus flow-cutset inequalities, 20 seconds to optimality



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de