Solution sol2--pioro40--D-B-M-N-C-A-N-N



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 255861.00
79
Total installed link capacities 271808.00
Average link capacity usage 99.98%
Average path length 3.88
Total number of paths 865
Average number of paths per demand 1.11
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Christian Raack, Zuse-Institute Berlin
Submission Date 06.11.2006
Additional information edge-flow formulation, CPLEX 10.0 plus flow-cutset inequalities, time limit 1h



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de