Solution sol1--atlanta--U-U-M-N-C-A-N-N



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 86492550.30
22
Total installed link capacities 294000.00
Average link capacity usage 95.12%
Average path length 2.63
Total number of paths 219
Average number of paths per demand 1.04
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Christian Raack, Zuse-Institute Berlin
Submission Date 06.11.2006
Additional information edge-flow formulation, CPLEX 10.0, 11 seconds to optimality



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de