Solution sol1--norway--U-U-E-N-S-A-N-P



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 1273020.00
51
Total installed link capacities 99000.00
Average link capacity usage 53.75%
Average path length 3.83
Total number of paths 702
Average number of paths per demand 1.00
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Sebastian Orlowski, Zuse-Institute Berlin
Submission Date 07.07.2006
Additional information path-flow LP with column generation, diversification constraints with single-path solution filter, B&C with metric inequalities, time limit 1h



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de