Solution sol1--di-yuan--U-U-E-N-S-A-N-N



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 729100.00
14
Total installed link capacities 135.00
Average link capacity usage 87.95%
Average path length 2.14
Total number of paths 22
Average number of paths per demand 1.00
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Sebastian Orlowski, Zuse-Institute Berlin
Submission Date 20.12.2005
Additional information path-flow LP with column generation, B&C with metric inequalities, time limit 1h



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de