Solution sol1--nobel-germany--U-U-E-N-I-A-N-N



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 161990.00
24
Total installed link capacities 1580.00
Average link capacity usage 98.20%
Average path length 2.88
Total number of paths 134
Average number of paths per demand 1.11
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Sebastian Orlowski, Zuse-Institute Berlin
Submission Date 20.12.2005
Additional information path-flow LP with column generation, B&C with metric inequalities, 8 minutes to optimality



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de