Solution |
show source:
native / xml;
download: native.zip / gz, xml.zip / gz
|
Total cost
|
12400.00
|
Total number of installed links
|
36
|
Total installed link capacities
|
155000.00
|
Average link capacity usage
|
92.28%
|
Average path length
|
2.89
|
Total number of paths
|
321
|
Average number of paths per demand
|
1.07
|
Solution statistics
|
show details...
|
Solution export |
GML
(see GML format)
|
Contributor |
Christian Raack,
Zuse-Institute Berlin
|
Submission Date |
06.11.2006
|
Additional information
|
edge-flow formulation, CPLEX 10.0 plus flow-cutset inequalities, 1 minute to optimality
|