Solution sol3--newyork--U-U-E-N-C-A-N-N



Solution show source: native / xml;  download: native.zip / gz,  xml.zip / gz
Total cost 1011372.00
15
Total installed link capacities 18000.00
Average link capacity usage 50.81%
Average path length 5.29
Total number of paths 240
Average number of paths per demand 1.00
Solution statistics show details...
Solution export GML  (see GML format)
Contributor Christian Raack, Zuse-Institute Berlin
Submission Date 06.11.2006
Additional information edge-flow formulation, CPLEX 10.0 plus flow-cutset inequalities, time limit 1h



Image of the solution:




© 2006 Zuse-Institute Berlin (ZIB)
http://www.zib.de